Bridge Repair — Tuesday, May 3, 2022

We had a huge log come down the canal and knock the warning poles off their foundation

What a mess!

Linkin was spending Friday and Saturday with us;

Terry and I had (Thankfully) lots of help.

It was a huge long process…taking two hours to get the two logs jacked up and out of the water

The water was running

fast and scary—and would have flipped us under the bridge if we fell in it

TLC Cai-Cai and Linkin ready to help

Terry finally got one log up, then had to get the second log up

Linkin holding up one of the logs

After much pulling, straining, lifting, and pondering.  Terry got all the logs up, wired together—good to go until this winter when the canal is dry and we can get in there to work on everything.

Your friend on a western Colorado farm,

Linda